Post-show reports
What this feature is for
Preserve a dated record of what happened during a show: manual GO times, team, incidents and the difference between planned and actual timing.
Where to find it
Consult the event's Documents area, including its post-show reports folder when reports have been generated.
Steps
- Review the show's actual timeline and confirm incidents and team details.
- Generate a report with the required project rights.
- Consult the dated report in the event's documents; preserve the original if a later correction is needed.
- In the LIVE control log, select the day and filters, then Export CSV or Export PDF: only displayed rows are exported. Times use the production time zone, just like the screen; the CSV also preserves the local date and the PDF states the day and time zone. Downloading does not automatically add a document to the folder.
What happens next
The report provides a trace for debriefing, insurance and administrative follow-up. A correction must not silently rewrite a previously issued report.
Who can take action
Production management and people authorized to manage the event; other access depends on their document permissions.
Common issues
- No report appears: check that one was generated and that your access allows you to see the folder.
- Recorded time differs from the plan: the actual GO is manual; planned durations are only estimates.
FAQ
Does the report trigger or change cues?
No. It records show activity; GO always remains manual.